Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents
maxLevel2
minLevel2
absoluteUrltrue
excludeSee also
typeflat
separatorpipe

Overview

The read confirmation feature allows workflow authors to request that users confirm they have read certain content.

workflow read confirmation can be enabled/disabled for the final state of a workflow using workflow builder.

In workflow builder the workflow Read Confirmation can edited to:

  • automatically assign users to undertake the read confirmation

  • set a due date for the read confirmation

  • allow users to edit the read confirmation due date

  • allow the reviewer to decide if workflow assigned read confirmation users (readers) are automatically assigned

Readers can be added and edited using the read confirmation popup when the content is in the final state.

Workflow read confirmation

By default, read confirmation is enabled in a workflow.

Image RemovedImage Added

The workflow default option is for read confirmation to be added every time the workflow enters the final state on an approval transition.

Edit read confirmation
Anchor
editreadcon
editreadcon

Choose the enabled Read Confirmation in the workflow panel top open the editor.

Using Workflow Builder

Child pages (Children Display)
pageUsing Workflow Builder

Related Pages

Read Confirmation (User Guide)

Child pages (Children Display)
pageRead Confirmation
first3

Read Confirmations (Workflow Authoring Guide)

Child pages (Children Display)
pageRead Confirmations
first2
Edit read confirmation Anchoreditreadconeditreadcon

Choose the enabled Read Confirmation in the workflow panel top open the editor.

Image Removed

Image Added

Users can be assigned to the read confirmation by

  • adding one or more usernames in a comma separated list

  • adding one or group names in a comma separated list

User will receive a request to undertake the read confirmation each time the workflow undergoes an approve transition to the final state. A user will also see their own outstanding user read confirmation requests in their user profile.

Due date

A

due date

Due Date can added for the completion of read confirmations.

This can set as a fixed date (YYYY-MM-DD format) or a period from the time of the approved transition to the final state.

Image Removed
Image Added

The Due Date time period can be

  •  a value of one of Year(s)Month(s)Day(s)Hour(s)Minute(s) Second(s)

  • ISO_8061 format e.g. P1Y6M for 18 months; P1DT12H for 36 hours.

The due date value can also be an appropriate value reference.

Check the box to allow users to edit the due date in the read confirmation popup on the content.

Disable read confirmation

In the workflow panel choose the read confirmation green-tick slider.

Confirm the request to DIsable the workflow read confirmation.

Image Removed
Image Added

The workflow panel will

display 

display the Read Confirmation as disabled. 

Image Removed
Image Added

Enable read confirmation

If read confirmation is disabled for the workflow, enable read confirmation by choosing Read Confirmation in the workflow panel.

Image Removed

The
Image Added

Enabling the read confirmation opens the read confirmation editor

will open.Add

to add any configuration required for the read confirmation.

Choose

Enable

Apply.

Read Confirmation is enabled for the workflow.

Image Removed
Image Added

For any changes including disabling/enabling a read confirmation ensure you:

choose 
  • choose Add in the read confirmation editor to confirm changes for the workflow read confirmation

choose 
  • choose Save in the navigator panel to add these changes to the workflow

  • select Exit in the Navigator panel to add the updated workflow to the content

See also

Using Workflow Builder

Child pages (Children Display)
pageUsing Workflow Builder

User Guide

Workflow Authoring Guide

Administration Guides